Storm line open 24/7 · (406) 555-0142

Serving the Ashford ValleyMon–Fri 07:00–18:00 · Sat 08:00–13:00

HaldenRoofing Co.
Farmhouse on Orchard Lane with a new roof and deck

Job 2389 · Orchard Lane

Tear-off and new deck

Farmhouse with a wraparound porch

Two layers of old shingle hid a deck that had gone soft along the eaves. We replaced 22 sheets, added ice shield to the porch roof and matched the grey to the siding.

Material
Architectural shingle
Size
41 squares
On site
5 days
Completed
Aug 2026

(The brief)

The brief

A second layer of shingle had been nailed over the first sometime in the 1990s. Every winter since, ice had built up along the porch roof and the eaves over the kitchen, and the owners had started to see the fascia bow.

They asked for a straight price for a new roof and a clear answer on the deck, because two other quotes had left the deck as an open-ended extra.

Job sheet
Job
2389
Address
Quarry Road, Orchard Lane
House
1910 farmhouse, 2 stories, wraparound porch
Foreman
Dee Marsh
Crew
Crew 3 · 6 roofers
Inspection
Tue 14 Jul 2026

(What we found)

41 photos, 3 findings, one plain answer

The report the owners received within 24 hours of the inspection, trimmed to its findings. Every one has a photo reference and a rating.

  • ReplaceWorn out across the area
  • RepairA specific fault letting water in
  • WatchNot urgent, check again next year
Inspection reportHR-2389 · Quarry Road, Orchard Lane
A roofer's boot pressing into the soft, rotted roof edge above the eaves
P-07 Kitchen eaves
Water stains and peeling paint on the white porch soffit
P-15 Porch roof
Dark water stains on the underside of the attic roof boards
P-22 Attic
  • ReplaceP-07Deck soft underfoot for 3 ft back from the eaves on the north and east sides
  • RepairP-15Ice dam staining on the porch soffit and fascia, no ice shield under either layer
  • RepairP-22No soffit intake anywhere, rust on nail tips from winter frost

41 photos · 3 findingsInspected by R. Halden

(Scope and numbers)

The written price, and what it came to

The quote the owners signed, and every change agreed on site, each one photographed before the work was done.

Written scopeQ-2389 · fixed price
Line items from the written quote for job 2389
ItemQtyPrice
Tear-off, 2 layers, disposal41 sq$7,380
Architectural shingle system41 sq$12,710
Ice & water shield, eaves, valleys + porch14 rolls$1,820
Continuous soffit intake vent72 ft$1,080
Ridge vent44 ftIncl.
Permit, dumpsters and disposal2 loadsIncl.
Deck boards, if neededper sheet$88
Agreed during the build
Deck sheets replaced along eaves (each photographed)22 × $88$1,936
Fixed price$22,990
Final invoice$24,926

Includes permit and disposalNo deposit until materials were delivered

41
squares
5
days on site
22
deck sheets replaced
2
layers removed

(Build log)

Day by day, as the owners saw it

Each entry is the daily text the owners received at the end of the day, with the photos left out.

Build logJob 2389 · Crew 3 · 6 roofers
  1. Fri 7 Aug

    Materials delivered, two dumpsters placedPorch furniture moved to the barn with the owners

  2. Mon 10 Aug

    Tear-off north and east, both layers, 9 deck sheets replacedPhoto set sent 17:55

  3. Tue 11 Aug

    Tear-off south, west and porch, 13 deck sheets replacedDry-in complete 18:20

  4. Wed 12 Aug

    Ice shield, underlayment, soffit vent cut inOwners picked Pewter Grey against the siding at 08:00

  5. Thu 13 Aug

    Shingles on the main roofAll four slopes finished by 17:00

  6. Fri 14 Aug

    Porch roof, ridge vent, clean-up and sign-offMagnetic sweep of lawn and gravel · warranty W-2389 issued

Daily text at 18:00Foreman: Dee Marsh

New shingles and a white gutter with a leaf guard along the Orchard Lane porch roof
Sign-off photo · Aug 2026

(The result)

How it turned out

The deck line is straight again and the fascia over the kitchen has stopped bowing. With intake at the soffits and exhaust at the ridge, the attic now runs within a few degrees of the outside air, which is what stops ice dams before they start. The owners chose Pewter Grey on the day, holding three bundles up against the siding.

25 yrWorkmanship warrantyW-2389 · expires Aug 2051

(Free inspection)

Want the same paperwork on your roof?