Storm line open 24/7 · (406) 555-0142

Serving the Ashford ValleyMon–Fri 07:00–18:00 · Sat 08:00–13:00

HaldenRoofing Co.
Three Halden roofers laying new architectural shingles over fresh underlayment on a lakeside house

Next free inspection Tue 11:30

01 · Roof replacement

Down to the deck and back again

Full tear-off, a photographed deck check, a complete roof system and a fixed written price. Most homes are done in three to five working days by one crew and one foreman.

Typical home
20–40 squares
On site
3–5 days
Warranty
25 years, transferable
Deposit
None until delivery

(Who it is for)

When a new roof is the honest answer

We replace roofs when the problem is spread across whole slopes, not when one flashing or vent has failed. If the inspection shows a repair will give you five good years, the report says so.

  • Granule loss across a slope

    Bare black mat showing, and granules collecting in the gutters and at downspout outlets.

  • Curling, cupping or cracked tabs

    Usually on the south and west slopes first, where the sun is hardest on asphalt.

  • Soft or bouncing deck

    Felt underfoot during the inspection, and confirmed from the attic with a moisture meter.

  • Repeated leaks in different places

    Three repairs in three years is the roof telling you something.

  • Two layers already

    Code allows two layers at most. A third means a full tear-off anyway.

  • Selling or insuring

    Some insurers will not renew on shingle roofs past 20 years.

(What is included)

What is in a Halden roof replacement

These are the lines you will see on your written scope. Nothing below is an optional extra we add later.

Written scopeRoof replacement
  1. 01Tear-off and disposal

    Every layer removed to the deck, dumpster on boards so the drive is protected, magnetic sweep of lawn and drive every evening.

  2. 02Deck check with photos

    Every sheet walked and checked before anything is covered. Rotten sheets are replaced at a fixed $88 per sheet, and you get a photo of each one.

  3. 03Ice and water shield

    Self-adhered membrane at eaves (two courses, 6 ft up), in every valley and around every chimney, skylight and pipe.

  4. 04Synthetic underlayment

    Over the rest of the deck, lapped and cap-nailed, so the house is watertight at the end of every day.

  5. 05Drip edge and starter

    Pre-bent metal drip edge at eaves and rakes, starter strip so the first course seals down in wind.

  6. 06Flashing, all new

    Step and counter flashing at walls and chimneys, new pipe boots, W-valley metal where the design calls for it. We never reuse old flashing.

  7. 07Roof system

    The shingle, steel, slate, tile or cedar you choose, installed to the maker's instructions with a 6-nail pattern on shingle.

  8. 08Ventilation balanced

    Ridge vent matched to the soffit intake you have. If intake is missing we price it as its own line.

  9. 09Permit and inspection

    We pull the permit and meet the building inspector where your town requires it.

  10. 10Paperwork

    Inspection report, fixed written price, a daily build log text with photos, sign-off walkthrough and a 25-year workmanship warranty.

(How it runs)

How a replacement runs, day by day

A 34-square, two-story house with one layer to remove. Bigger roofs add days in the middle, not surprises at the end.

  1. Week 0

    Inspection and written price

    45 minutes on the roof and in the attic, photo report within 24 hours, fixed written price within 48 hours. You choose material and colour with samples on the house.

  2. Day before

    Delivery

    Materials on the roof or the drive, dumpster on boards. This is when the 40% invoice goes out, never before.

  3. Day 1

    Tear-off and deck

    We only open as much roof as we can make watertight by evening. Every replaced deck sheet is photographed. Daily text at 18:00.

  4. Day 2

    Dry-in

    Ice and water shield, underlayment, drip edge and valley metal. The house is sealed even if the weather turns.

  5. Day 3–4

    Roofing and flashing

    Shingles or panels go on slope by slope, with new flashing woven in as each course reaches a wall or chimney.

  6. Last day

    Ridge, clean-up, walkthrough

    Ridge vent and caps, gutters flushed, magnetic sweep. We walk the finished roof with you (or show you the photos) and send the warranty.

(Price guide)

Guide prices for common Ashford Valley homes

Worked out with the same numbers as our estimator. Your fixed price comes after the inspection, because decking and flashing are where estimates go wrong.

Guide prices for roof replacement
JobWhat it coversGuide price
Single-story ranch, 1,500 sq ft20 squares · 1 layer off · architectural shingle$11,800–$14,800
Two-story colonial, 1,800 sq ft24 squares · 1 layer off · architectural shingle$15,000–$18,700
Two-story, steep, two layers, 2,200 sq ft34 squares · 2 layers off · architectural shingle$23,800–$29,700
Two-story in standing seam steel, 1,800 sq ft24 squares · 1 layer off · standing seam steel$30,000–$37,500
Cottage in natural slate, 1,200 sq ft19 squares · 1 layer off · natural slate$35,400–$44,200
Deck sheets
$88 each, only if needed, each one photographed
Extra layer to remove
$90 per square
Chimney step and counter flashing
From $640 per chimney
Soffit intake where none exists
$12–18 per foot

(Questions)

Straight answers before you call

Still unsure what your roof needs?

Book a free inspection
How long does a roof replacement take?

Most homes take three to five working days. We only open as much roof as we can make watertight by the end of the day, and we check the forecast every morning.

Can you put a new layer over the old one?

We do not. A second layer hides the deck, adds weight, shortens the life of the new shingle and voids some manufacturer warranties. We always tear off to the deck.

Do I need to be home while you work?

No. We need access to an outdoor power point and the driveway for the dumpster. You get a text with photos at the end of each day, and we walk the finished roof with you on the last one.

What happens if you find rotten deck?

It is already on your quote at a fixed $88 per sheet. We photograph every sheet before we replace it and the photos come with the daily text, so the final invoice has no surprises.

When do I pay?

Nothing until your materials are delivered to the house. Then 40% on delivery and the balance once you have signed off the finished roof.

What does the warranty cover?

Our 25-year workmanship warranty covers leaks caused by how we installed the roof, and it transfers once if you sell. Material defects are covered separately by the manufacturer.

(Free inspection)

Find out what your roof actually needs.

A free 45-minute inspection and a photo report within 24 hours. The fixed price follows within 48 hours, with no deposit until materials arrive.